Entry: | Pg. 69, Firing Chamber, 6/5/1968, 1968-021-31, Cement floor, east-west drain, bedrock, rut- to rear, east wall of northwest shop 1 | |
Pg. 69, Firing Chamber, 6/5/1968, 1968-021-32, Detail of east drain (with scale), cement floor, rear cutting for basin wall (?) | ||
Date: | 6/5/1968 |