Entry: | Pg. 68, 13/4/2004, Drawing, Baskets 22-26, section drawing | |
Pg. 69, Fill beneath the road surface, 13/4/2004, NB960 B26, Fill beneath the road surface, Lot 2004 26 | ||
Pg. 69, Fill beneath the road surface, 13/4/2004, NB960 B26, Fill beneath the road surface, Drawing, Basket 26 top plan | ||
Date: | 13/4/2004 |