Entry: | Pg. 163, bracing operation under cracked lintel in cistern, 19/5/2006, NB978 B75, bracing operation under cracked lintel in cistern, Lot 2006 12 | |
Pg. 164, 19/5/2006, Drawing, Starting top plan for Basket 75 | ||
Pg. 164, 19/5/2006, Drawing, Starting cross section: Basket 75 | ||
Date: | 19/5/2006 |