|
Room 8 [N: 1088.00 N, S: 1077.00 N, E: 129.00 E, W: 121.00 E]
Room 7 [N: 1086.30 N, S: 1078.20 N, E: 123.90 E, W: 119.40 E]
Rodríguez-Álvarez, Emilio
Session III
Introduction:
This is the final report ... excavation in the area revealed a ... area took place in a ... as a dump area. The |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... ancient cut of road 3 to a ... Catherine A. Uritis
Corinth 2022 ... road (3) was laid. The |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... (C-2022-7 and C-2022-20) appear ... excavation area consisted of a ... the W), a road whose width |
Charles George, Rossana Valente
Nezi Field Excavations
N: 1015.90 N, S: 1006.90 N, E: 264.20 E, W: 255.50 E
28 May – 22 June, 2012
This is a final summary of the third season of excavation (28th May – ... -29, 105-126), and a 2nd-3rd c ... 6th- early 7th c. AD floor ... late 11th c. In a later |
|
|