|
| 132 133 Pg. 132, Cleaning between Wall 56 and RT 130R, 21/4/2003, NB941 B69, Cleaning between Wall 56 and RT 130R, Lot 2003 59 ... 21/4/2003 |
| 134 135 Pg. 134, 21/4/2003, 2003-008-02, Diamond-tiled floor E of Wall 56. From N ... 21/4/2003 |
| 138 139 Pg. 139, 21/4/2003, Drawing, Top Plan Basket 71 ... 21/4/2003 |
| 140 141 Pg. 141, Drawing, Top Plan Baskets 72,73,74 |
| 142 143 Pg. 142, Removal of drain between Wall 56 and block N of Wall 193 (NB 960 B1), greyish soil, pottery, 23/4/2003, NB941 B73, Removal of drain between Wall 56 and block N of Wall 193 (NB 960 B1), ... 23/4/2003 |
| 144 145 Pg. 144, Fill S of Wall 193, under diamond-tiled floor (B70=B71). Brown soil, cobbles, tiles, pottery., 23/4/2003, NB941 B75, Fill S of Wall 193, under diamond-tiled floor (B70=B71). Brown soil, ... 23/4/2003 |
| 146 147 Pg. 147, 23/4/2003, Drawing, Top Plan Basket 76 ... 23/4/2003 |
|
|