North of Nezi 2010
White Second Session Report (John Tully)
The following summarizes the results of excavations in two areas north of Nezi field during the second session of the 2010 excavation season ... 1023.65-1028.00 N. This was known as ... referred to as the West Room.
- ... 1027.53-1028.88 N. This was known as |
Introduction:
This is the final report for the second session of excavations of the 2015 season for Room 3, Unit II in the area of Temple E SE. In the 1990’s, Room 3 was divided by the grid system and, ... 3 as a location to dump ... Room 3, Unit II in the area ... 1990’s, Room 3 was divided by |
Kelly E. O’Connor and Catherine A. Uritis
Corinth 2022 Session II (5/9/22- 5/27/22)
27 May 2022
Northeast of Theater, Trench 19B, Session II Final Report
Elevations of Identified Road Levels in 19B South ... between Roman fill TBD
3 ... appears within Context 46. As ... road (3) was laid. The |
This is the summary of the second session of excavation in 2014 in Unit 2, Room 7, and the adjacent passage north of the church nave, in the area of Temple E Southeast (TESE). Room 7 was previously excavated ... west, and by Wall 157 (1078.3 – 1085.3 N, 122.4 – 124.6 ... N as a boundary to the |
Charles George, Rossana Valente
Nezi Field Excavations
N: 1015.90 N, S: 1006.90 N, E: 264.20 E, W: 255.50 E
28 May – 22 June, 2012
This is a final summary of the third season of excavation (28th May – ... as exterior space ... (S 936, removed as 957), ... we interpret as the |
N-S 1074.64-1071.50; E-W 125.50-122.70
Session 2-3 Final Report, June 27, 2014
This is the final report of the second and third sessions during the 2014 excavations in the church nave in Unit 2 of the ... 125.50-122.70
Session 2-3 Final ... Kennedy worked as area ... 3, work in this area |
Luke Madson and Jesse James, Session III 2022 (May 30 - June 24)
Excavation Summary:
This excavation took place from May 30 to June 17, 2022, during the third excavation session of the season. It continued ... 3. As so far exposed in ... and Luke Madson worked as ... and Water Pipe 3, running |
This is the final report for the area excavated by the green team in Temple East – Southeast during the first session of excavation of 2014. Guy Sanders (director) and Jody Cundy (field director) supervised ... as recorders. The ... excavation of the area as a ... approximately 3.5m wide, according to |
|
|